9/27~10/1
Created repositor and Token, download Inventor and Solvespace.
10/6
Increased Vedio Columns and Fatal List.
10/13
Ended the class challenge.
https://github.com/mdecourse/cad2021/discussions/11
10/14
Edited little challenge code.
10/21
Re make RUN and Layout
10/24
Update information of the CAD1 and CAD2 Software introduce.
11/2
Recording SolveSpace download video and put on the webside.
11/11
fix video problem and upload Inventor and Solvespace operate videos.
11/11
upload Inventor video.
12/16
upload four-bar mechanism W11.
12/16
upload Solvespace and Iventor work progress.
12/16
upload W13-2 Wink video.
12/16
upload W13-3 Wink video.
12/23
updata website version 1.4.
12/23
upload Wink tutorial video.
12/30
tried to make final project file.
1/6
final exam.1 version.1.
1/6
final exam.1 version.2.
1/6
push final exam.1 version.2 again because failed.
1/6
change Wink absolute url files.
1/6
fix and push wink absolute url files 3 times.
1/8
complete final exam.1.
1/8
change final exam.1 all wink absolute url files.
1/8
upload final exam.1 last version.
1/13
updata web version.
1/16
upload 期末考試第一階階和第三階段.